4-week forecast window open. 5 disciplines have not submitted their resource forecast: Electrical, Structural, Telecom, Automation / BMS, Fire Protection.

Executive summary

DE planning snapshot W38 260914 — required vs actual design resources across the portfolio.

Client
Country
Project
Discipline
Week from
Week to

Source: DE planning snapshot W38 260914 — same data as Projects > Forecast.

Projects

7

+ 15 BD opportunities

Visible pipeline

1,840

MW IT · filtered portfolio

People needed now (W43)

116.8

planned across filtered projects

Avg needed (range)

93

people per week · W32 – W51

Peak team size

W48

132 people planned

Reserved for Pure DC

500

MW dedicated · other clients run in parallel

Workforce Capacity (live)

Open Workforce Capacity

Peak required

404

Peak actual

254

Peak headcount

395

HR objective

510

5 disciplines · W32 – W53 · edits made in Workforce Capacity appear here

Project Forecasting (live)

Open Project Forecasting
  • Seinajoki Phase 131.7 req · 21.2 act
  • Wilton16.8 req · 3.3 act
  • Seinajoki End of 08/202615.5 req · 1.4 act
  • Seinajoki End of 08/202614.4 req · 0.6 act
  • Madrid MAD0113.1 req · 6 act

Top projects by weekly demand · same live forecast edited in Project Forecasting

People per week by discipline

Pure DC · required, stacked · dashed = total capacity (417 now → 467 with hires) · green = remaining workforce · free capacity is the gap between the dashed line and the stacked demand · capacity from Forecasting & Planning

Planned people per week

by discipline, stacked bars

Resource usage by project

avg people per week · top 6 projects in scope

Portfolio mix

IT power split · 7 projects in scope · 1,840 MW total

People per week by discipline — required, allocated and gap

each cell: required / allocated / still missing
DisciplineW32W33W34W35W36W37W38W39W40W41W42W43W44W45W46W47W48W49W50W51Window
Architecture
7
7
·
10
9
1
13
12
1
22
18.5
3.5
27
20.5
6.5
26
21
5
26
21
5
16.5
16.5
·
16.5
16.5
·
16.5
16.5
·
24.5
12.5
12
30.5
12.5
18
32
10
22
32
·
32
30
·
30
29
·
29
28
·
28
28
·
28
24
·
24
24
·
24
462.5
193.5
269
Structural & Civil
4
4
·
7
7
·
9
7
2
9
7
2
10
8.5
1.5
9
8.5
0.5
9
8.5
0.5
5.3
4.3
1
5.3
5.3
·
5.3
5.3
·
7.3
3.3
4
11.3
3.3
8
14
3
11
14
·
14
14
·
14
16
·
16
16
·
16
16
·
16
14.5
·
14.5
14.5
·
14.5
210.3
74.8
135.5
Mechanical
11
10
1
13
12
1
14
12
2
14
12
2
14
12.5
1.5
7
9.5
·
10
12.5
·
12.5
9.5
3
13.5
9.5
4
13.5
9.5
4
20.5
6.5
14
27.5
6.5
21
31
6
25
28
·
28
28
·
28
28
·
28
29
·
29
29
·
29
26.5
·
26.5
26.5
·
26.5
396.5
128
268.5
Electrical
10
10
·
12
12
·
13
12
1
13
12
1
13
12.5
0.5
7.5
7
0.5
10.5
10
0.5
12.5
6.5
6
14.5
6.5
8
14.5
6.5
8
20.5
6.5
14
28.5
6.5
22
33
6
27
30
·
30
30
·
30
30
·
30
30
·
30
30
·
30
26.5
·
26.5
26.5
·
26.5
405.5
114
291.5
Execution Design + Prefab Design
9
5.5
3.5
13
4
9
14
10.3
3.8
15
16.3
·
15
15.3
·
15
14.3
0.8
15
14.3
0.8
14
14
·
14
12
2
14
12.5
1.5
15
12.5
2.5
19
14.5
4.5
20
14
6
18
·
18
18
·
18
26
·
26
29
·
29
29
·
29
37
·
37
37
·
37
386
159.3
226.8
All disciplines
41
36.5
4.5
55
44
11
63
53.3
9.7
73
65.8
7.2
79
69.3
9.7
64.5
60.3
4.2
70.5
66.3
4.2
60.8
50.8
10
63.8
49.8
14
63.8
50.3
13.5
87.8
41.3
46.5
116.8
43.3
73.5
130
39
91
122
·
122
120
·
120
129
·
129
132
·
132
132
·
132
128.5
·
128.5
128.5
·
128.5
1,860.8
669.6
1,191.2

Top value = required people, middle = allocated, bottom = still missing.

Disciplines

Demand per discipline in the selected week window, from the same snapshot that feeds Projects > Forecast

Architecture

W32 – W51

32

peak people

W44

peak week

6

projects

Structural & Civil

W32 – W51

16

peak people

W47

peak week

6

projects

Mechanical

W32 – W51

31

peak people

W44

peak week

6

projects

Electrical

W32 – W51

33

peak people

W44

peak week

6

projects

Execution Design + Prefab Design

W32 – W51

37

peak people

W50

peak week

6

projects

Planned people heatmap

required FTE per discipline & week
DisciplineW32W33W34W35W36W37W38W39W40W41W42W43W44W45W46W47W48W49W50W51
Architecture710132227262616.516.516.524.530.53232302928282424
Structural & Civil479910995.255.255.257.2511.2514141416161614.514.5
Mechanical111314141471012.513.513.520.527.531282828292926.526.5
Electrical10121313137.510.512.514.514.520.528.533303030303026.526.5
Execution Design + Prefab Design913141515151514141415192018182629293737